RSID Project: Evergreen Sidewalk Project Phase I

Details:

Current Stage:
Project Financing
Previous Stage:
Construction
RSID Number:
159
Resolution Number:
2539

Description:

Improvements include design, engineering, construction, and ongoing maintenance of ADA compliant sidewalk connectivity between US Highway 35 and East Evergreen Drive on the east side of US Highway 2 and between US Highway 35 and Meadowlark Drive on the west side of US Highway 2. MDT awarded the construction contract to Razz Construction Inc. Construction was completed through the summer of 2024.