RSID Project: Evergreen Sidewalk Project Phase I

Details:

Current Stage:
Construction
Previous Stage:
Final Design
RSID Number:
159
Resolution Number:
2539

Description:

Improvements include design, engineering, construction, and ongoing maintenance of ADA compliant sidewalk connectivity between US Highway 35 and East Evergreen Drive on the east side of US Highway 2 and between US Highway 35 and Meadowlark Drive on the west side of US Highway 2. MDT has awarded the construction contract to Razz Construction Inc. Construction is planned for the summer of 2024.

Photos:

Evergreen PIO Handout.jpg
Phase_1_Maps_1.jpg
Phase_1_Maps_2.jpg
Phase_1_Maps_3.jpg
Phase_1_Maps_4.jpg
Phase_1_Maps_5.jpg
Phase_1_Maps_6.jpg
Phase_1_Maps_7.jpg
Phase_1_Maps_8.jpg