RSID Project: Evergreen Sidewalk Project Phase I
Details:
Current Stage:
Construction
Construction
Previous Stage:
Final Design
Final Design
RSID Number:
159
159
Resolution Number:
2539
2539
Description:
Improvements include design, engineering, construction, and ongoing maintenance of ADA compliant sidewalk connectivity between US Highway 35 and East Evergreen Drive on the east side of US Highway 2 and between US Highway 35 and Meadowlark Drive on the west side of US Highway 2. MDT has awarded the construction contract to Razz Construction Inc. Construction is planned for the summer of 2024.