RSID Project: Manning Road
Details:
Current Stage:
Construction
Construction
Previous Stage:
Final Design
Final Design
RSID Number:
160
160
Resolution Number:
2582
2582
Description:
Improvements include design, engineering and construction for drainage improvements, possible realignment of right-of-way, re-grading and reshaping the existing base, additional aggregate, re-grading of driveways and approaches, seeding and recovering of disturbed areas, and double-shot chip seal of 2.5 miles of Manning Road and Farm Road.
Construction started in the fall of 2024 and is scheduled to be complete summer of 2025.